Berth No. 4, Thames Estuary
Revetment Stripping & Quay Wall Infilling along the new 430m long Berth No 4
Brodick Ferry Terminal - Underwater demolition of Caissons
Plant Hire Contract to provide resources to demolish 4No underwater Caissons
BAE Govan – New Dock Bund & Piling Platform, Glasgow
Stena Victoria Terminal 4 Berth, Belfast Harbour - Scour Protection
Ashleigh were appointed as specialist marine contractor by John Graham Construction Ltd to place scour protection material to a fully operational berth in Belfast Harbour
Strangford Lough Yacht Club - Slipways and Jetty Refurbishment
Ashleigh were appointed as Main Contractor by Strangford Lough Yacht Club to refurbish a Jetty and reconstruct two Slipways over the winter season 2021/2022
North Breakwater Construction, Aberdeen Harbour Expansion Project
Ashleigh Contracts were appointed in March 2018 as specialist marine Subcontractors working for Dragados UK Ltd to continue with and complete the last 440m of North Breakwater construction following Dragados’ commencing of the initial circa 200m of the Breakwater in 2017.
Dredging, Reclamation & Storage of TBT Contaminated Silts at Musgrave Channel
Ashleigh Contracts were appointed as Main Contractors working for Belfast Harbour Commissioners at Musgrave Channel.
Peterhead Revetment and Reclamation Area
Ashleigh Contracts were appointed as specialist marine Subcontractors working for Boskalis Westminster (Dredging) Ltd.
Seabed Protection Repairs - D1, Belfast Harbour
Ashleigh Contracts were appointed by Dong Energy and Scottish Renewals to carry out the seabed protection repairs at the D1 offshore Wind Facility in Belfast Harbour.
Alexandra Parade Revetment, Peterhead Harbour
Revetment upgrade along Alexandra Parade using 20T X Bloc Units
Sumburgh East Runway Remedials
Ashleigh Contracts were appointed as the specialist marine contractor for this project to undertake the overlaying of the existing rock Revetment profiles and construct a new X Bloc Revetment.
Fraserburgh North Harbour Deepening
Ashleigh Contracts were awarded the rock dredging of the North Harbour Deepening works at Fraserburgh Harbour by main contractors McLaughlin & Harvey.
London Gateway Port - Stage 2 Revetment Works
A joint venture between Laing O’Rourke and Dredging International (LORDI) were appointed by DP world to construct the new London Gateway deep water Container Port and associated Logistics Park on the north shore of the Thames River at Stanford Le Hope.
Rush North Beach Augmentation & Civils Works, Co. Dublin
This contract for ABB comprised the onshore civils works associated with the protection of the foreshore where the main power interconnector between north Wales and Ireland came ashore at Rush North Beach, Co. Dublin.
Stena VT4 Scour Protection Works, Belfast Harbour
Ashleigh Contracts were appointed as main contractors working at Belfast Harbour.
Scope of Work
Ashleigh Contracts were appointed by Greenore Port Ltd to dredge and remove 3,500m3 of Rock to deepen Berth No. 1
Carrickfergus Marina and Harbour Dredging
Ashleigh Contracts were awarded this dredging contract as Main Contractors for Mid & East Antrim Borough Council.
Phase 2 Dredging at Torry Quay, Aberdeen Harbour
Dredging and sea disposal of approx. 48,000m3 along the approach channel at Torry Quay.
Montrose Depwater Berth - Dredging & Underwater Clearance
Dredging and disposal at sea of 32,500m3 to provide a berthing pocket
Phase 1 Dredging at Torry Quay, Aberdeen Harbour
West Rhyl Flood Defence Works
Ashleigh Contracts were appointed by Galliford Try as their specialist revetment subcontractor on the £8 million contract to upgrade the flood defences for the western side of the town of Rhyl. The project was designed to reduce the flood risk and protect more than 2,000 residential and 500 commercial premises against a 1:200 year storm event.
Victoria Terminal 4, Belfast (New Stena Berth)
RNLI Castletownbere Pontoon Piling
Mobilisation of a road-transportable Modular Spudleg barge and an Odex Drilling Rig which was driven onto the Barge from a slipway adjacent the RNLI Station.
Strangford Pontoon & Piling Works
Portglenone Marina Phase 2 - Pontoon Piling
Tall Ships Pontoon Installation, Belfast
Carrickfergus Harbour & Marina Upgrades
Ashleigh Contracts were appointed as specialist subcontractors by Marinetech to install locating piles to receive the new pontoon systems
Upgrades to Ballyronan Marina, Lough Neagh
Upgrades to The Battery Harbour, Lough Neagh
Replacement Jetty at Portneal, Kilrea
New RNLI Berth at Rosslare, Co. Wexford
Mid Ards Trunk Main - Section F
Refurbishment of South Pier, Kilkeel Harbour
Lower Bann Jetties (Phase 2) – Civils Works
Bessbrook Pond Refurbishment, Newry
Ashleigh Contracts were appointed as Main Contractors to stabilise the main embankment of the Bessbrook Pond
Quay Wall at Killyleagh Harbour Development
Bushmills WwTw Scour Protection
This contract was carried out alongside GEDA’s contract for the construction of a new wastewater treatment works on the banks of the River Bush to the east of Bushmills. The new treatment facility was being constructed immediately adjacent the flood plain of the river, and we were commissioned to construct scour protection measures along a 80m long section of river bank adjacent the facility to prevent any further deterioration of flood protection embankments.
Reinforced Earth Slope and Coastal defence at Roneragh, Co. Donegal
Portavogie Slipway Refurbishment and Effluent Collection System
Killough Rope Walk, Co. Down
Ashleigh Contracts were appointed as Main Contractors for this masonry refurbishment project
Strandhill Coastal Defences and Slipway, Sligo
Kilkeel Harbour Quay Wall Repairs
Ashleigh Contracts were appointed as specialist subcontractors for the marine piling & quay wall works by McLaughlin & Harvey
Hitachi EX1200XXL
200T Triple Boom Long Reach Excavator for heavy lift duties c/w Prolec PCX-Pro 3D GPS
Hitachi EX1200 Super Long Reach
120T Excavator available in a variety of reach configurations from 17.5m to Super Long Reach at 28.5m c/w Prolec PCX-Pro 3D GPS
CAT 395 LCR (21m) Long Reach Excavator
95T Long Reach Excavator with 21m reach capability c/w Prolec PCX-Pro 3D GPS
CAT 385C (17.5m) Long Reach Excavator
90T Long Reach Excavator with 17.5m reach capability c/w Prolec PCX-Pro 3D GPS
Hitachi ZX750 (25m) Long Reach Excavator
75T Long Reach Excavator with 25m reach capability c/w Prolec PCX-Pro 3D GPS
CAT345 (19.6m) Long Reach Excavator
This CAT345 Long Reach machine has a 19.6m reach capability c/w Prolec PCX-Pro 3D GPS. An unusual feature is the hydraulic cab-riser which has proved invaluable for operation of the machine over quay walls for silt removal and armour placement. The machine has an extra-wide cab and has in-built dredgepump capability - for use with DAMEN DOP 1815 and 2320 dredgepumps.
JCB JS380 (21m) Long Reach Excavator
42T Long Reach Excavator with 21m reach capability c/w Prolec PCX-Pro 3D GPS
Doosan DX700
70T Tracked Excavator with 7.7m Boom and 2.9m Dipper
CAT365CL and CAT365LME
65T Tracked Excavators in Mass Excavation and Reach configurations
CAT 345
50T Tracked Excavator in Mass Excavation configuration. Can be supplied with a range of rock armour grabs
Komatsu PC340
35T Tracked Excavator can be supplied with a rock armour grab
Hitachi EX135
13T Tracked Excavator
Hitachi EX75UR
7.5T Zero Tailswing Tracked Excavator
Volvo EC25 Mini Excavator
2.5T Mini Tracked Excavator
CAT740 Dumptrucks
Ashleigh currently have a fleet of 5No CAT740 Dumptrucks in the fleet
VOLVO A25
Ashleigh currently have 1No Volvo A25 Dumptruck for smaller sites
VOLVO A25 FUEL TANKER
Mobile Site Fuel Bowser and Hydraulic Oil Dispenser based on the chassis of a Volvo A25 Dumptrcuk
SITE DUMPERS
Ashleigh currently have 2No 6T Swivel Dumpers and 1No 1T High-Lift Dumper for small site use
CAT988 Loading Shovel
JCB 535-125 Telehandler
Mercedes Actros 4165s Titan Tractor Unit
8x4 Tractor Unit plated to 250T for haulage of heavy plant & equipment
DAF XF105 6X4 TRACTOR UNIT
Faymonville 5+3 Gooseneck Low Loader Trailer
5 Axle Low-bed with 3 Axle Jeep Dolly as a Beam Low Loader
NOOTEBOOM GOOSENECK 6 AXLE TRAILER (85T)
MONTRACON STEPFRAME TRAILER (42T)
MISCELLANEOUS TRAILERS
KOMATSU D65EX
CAT D6T LGP Dozer with Trimble GCS9000 Grading system
CAT D6T LGP Dozer
Ravestein Modular Pontoon Barge - 24m x 12m
Jack-Up Working Platform
Hasekamp Modular Pontoon Barge
Atlas Copco HB4700
Roadsweep
Extension Beams
Hydraulic Thumb Grabs
14T Hydraulic Block Grab
Mechanical Concrete Pulveriser
Atlas Copco HB4200
Montabert V55 Rockhammer
Montabert 125SX Rockhammer
Oct 2012
May 2011
Jul 2011
Jul 2009
Nov 2008
Mar 2007
Apr 2006
Jul 2004
Jul 2003
Oct 2023
Jul 2023
Apr 2023
Mar 2022
Apr 2022
Nov 2019
Jan 2017
Dec 2017
Feb 2016
Oct 2015
Jun 2015
Jul 2015
Apr 2013
Jun 2012
Apr 2012
Mar 2012
Sep 2011
Nov 2021
Feb 2012
Mar 2011
Feb 2011
Apr 2010
Sep 2009
Aug 2008
Apr 2008
Sep 2008
Mar 2005
Dec 2005
May 2005
Oct 2005
Dec 2002
Jan 2001
Jan 1999
Jul 2007
Feb 2007
Mar 2003
Nov 2001
Jul 2000
Oct 2007
Sep 2005