Company Director
Company Director
Philip is involved in all aspects of procurement, contract administration and the establishment and operation of the company's Management Systems
Qualifications: B.Eng, C. Eng, MICE HSE Part IV Commercial Air Diver
1987 Graduated from Queens University, Belfast with an Honours Degree in Civil Engineering in 1987
1987/1989 Joined Charles Brand Ltd and worked as a Site Engineer and Diving Engineer on the Bangor Seafront Development Phases II and III. Responsibilities included the setting out, planning, site records and monthly valuations.
1989/1991 Transferred to Kier Ltd and worked for 13 months as a Design and Planning Engineer in the civil engineering projects office in Bedfordshire. Responsibilities included design calculations for piling and pre-cast pre-stressed concrete deck units for a 3.3km approach jetty over water, launch profiles for offshore pulls and various sheet piled cofferdam application
1992/2002 Employed by McLaughlin & Harvey initially as a Contracts Manager with responsibilities including Term Contract work in the ports of Larne, Warrenpoint, Cairnryan and Stranraer. Since 1993 the main responsibilities included estimating on a variety of civil engineering tenders, including successful contract awards for drainage schemes, bridge replacement and bridge strengthening works. Other successful awards were rock armoured sea defence works, concrete and gunite repairs and sheet piled quay walls Between 1995 and 1996 involved on the estimates for and contract management of the reconstruction of two major contracts in the port of Cairnryan. Berth No. 1 was reconstructed comprising a new sheet pile wall, pilecap and fendering system whilst maintaining the existing P&O Ro-Ro ferry service. This was followed by the construction of a new quay and berthing facility at Berth No. 2 in Cairnryan for the new P&O Jetliner Service. Appointed as the Civil Engineering Manager for McLaughlin & Harvey in March 1999. During the period from 1999 to 2001 the annual turnover for the company in civil engineering rose from £2.5 million to £6.0 million for year ending 2001. As Civil Engineering Manager main responsibilities included the estimating, contract management and valuations for a number of major civil engineering schemes. These schemes included: Glenarm Harbour Improvements (£3.0m) Sea Defences for Translink (£0.9m) Glenarm Sewer Improvements (£0.7m) A number of footbridge and rail bridge replacements (total £1.5m) Term Maintenance Contracts with Translink and Larne Harbour.
January 2002/Present Joined Ashleigh (N.I) Ltd. as a shareholding Director. Mainly responsible for the procurement, administration and management of civil engineering contracts, including the following:- Strandhill Sea Defences, Sligo (£0.4m) Reinforced Earth Slope and Coastal Defences at Fahan Co. Donegal (£0.13m) Construction of new Berth for RNLI at Rosslare, Co. Wexford (£0.7m) Remedials to Kilkeel Harbour including new Core Loc armoured breakwater (£0.3m) Lower Bann Jetties for Waterways Ireland - Toomebridge (2No), Movanagher (2No), Carnroe D/S and The Cutts D/S (£0.6m) Quoile Barrier Remedial Works - completed in October 2005 (£0.45m) Portavogie Slipway refurbishment - completed December 2005 (£0.1m) Portneal Replacement Jetty - completed March 2006 (£0.2m) Port Oriel Upgrading & Modernisation - completed in Feb 2007 (£0.4m) Warrenpoint Ro Ro Berth Upgrade - completed in Jan 2007 (£0.3m) The Battery Harbour & Ballyronan Marina Upgrades - completed in March 2007 (£0.25m) Mid Ards Trunk Main, Section F - completed in Oct 2007 (£0.75m) Port Oriel Upgrading & Modernisation - completed in Feb 2007 (£0.4m). Warrenpoint Ro Ro Berth Upgrade - completed in Jan 2007 (£0.3m). The Battery Harbour & Ballyronan Marina Upgrades - completed in March 2007 (£0.25m). Ness Brae Coastal Defences, Fife (Scotland) - Completed July 2007 (£0.35m). Victoria Primary School, Ballyhalbert - Due for completion in Spring 2008 (£0.13m). Caladh Mor Harbour, Inishmaan (Aran Islands, Galway) - Due for completion Summer 2008 (£1.0m). Kilkeel Quay Wall Repairs - Due for completion in Spring 2008 (£0.5m). Kilronan Harbour Development (Aran Islands, Galway) – our works completed September 2009 (£1.6m). Tall Ships Pontoon Piling & PC Anchor Blocks, Belfast – Completed July 2009 (£0.2million). Greystones Harbour Development – Revetment Works – Due for completion in Spring 2010 (£1.6m).
Philip was responsible for the implementation of the following Management Systems operated and maintained=ed by the company:-
Philip has also introduced a Computerised Maintenance Management System (CMMS) in the form of the eMaint platform to assist with and record the reporting, actioning and recording of all planned and reactive maintenance and repair of the company's extensive range of plant and equipment assets - which currently extends to over 300 listed asset items.
Ashleigh Contracts attempt as far as possible to carry out all contracts works using their own range of specialist marine civil engineering plant & equipment and keep a core staff of experienced management and skilled operatives who operate as distinct teams on projects throughout the UK and Ireland.